Luz
Energy · Infrastructure · Capital · Advisory
We assemble capital, projects, and buyers in clean energy and infrastructure. We close the deals others can’t.
Begin
02/ 09The Gap
Most energy projects die in the last mile.
Capital sits idle. Developers stall. Buyers wait. The bottleneck is rarely the technology — it’s the assembly. Three counterparties, three blockers, and no one in the middle.
We close the gap.
NETWORK · 3 NODES · FORCE-DIRECTED · v0.4
CONNECTIONS: 0 / 3
SCROLL TO ASSEMBLE
→ DRAG ANY NODE TO REORGANIZE THE NETWORK
03/ 09What we do
Three practices.
One company.
P/01 · ADVISORY
Advisory.
We structure and broker energy and infrastructure deals.
P/02 · CAPITAL
Capital.
We fund stranded and last-mile projects through our fund and SPVs.
P/03 · VENTURES
Ventures.
We co-develop the projects we want skin in.
04/ 09The Numbers
What is in motion, right now.
$1B+
Active pipelineCommitted and pre-committed deal flow.
9
Development projects in motionCurrently across structuring and pre-construction.
2,000+
Acres under developmentLand secured, optioned, or in due diligence.
8
CountriesActive partner, project, or capital position.
6
VerticalsSolar, hydrogen, nuclear, storage, data, LNG.
05/ 09Verticals
What we move.
Six tracks. Each one is its own world — technically, commercially, geopolitically. We operate in all of them because the last-mile gap is the same shape no matter the asset.
01SOLAR
02HYDROGEN
03NUCLEAR
04STORAGE
05DATA
06LNG
↓ SCROLL · LATERAL TRAVERSE BEGINS
V/01 · SOLAR
SPECTRUM 380—780nm · CAPACITY FACTOR 0.21—0.34
Solar.
Distributed and utility-scale. Greenfield, brownfield, repowering. Where the offtake exists, we structure it; where it doesn’t, we bring the buyer.
SCALE5MW — 1GW+
MARKETSGlobal
FORMATDistributed · Utility
V/02 · HYDROGEN
H₂ · 2.016 g/mol · DENSITY 0.0899 g/L
Hydrogen.
Green, blue, and white. Production and offtake. The cleanest molecule plus the cheapest molecule — we bridge between the two markets.
TYPEGreen · Blue · White
MARKETSGlobal
USEProduction · Offtake
V/03 · NUCLEAR
SMR · 40—300 MWe · TRL 7—9
Nuclear.
Small modular reactors only. Where data center demand outruns grid build, SMRs are the only physical answer that ships before 2030.
UNITSMR · modular
MARKETSUS · CA
OUTPUT40 — 300 MWe
V/04 · STORAGE
Li-ion · 0.5C—1C · 92% RTE
Storage.
Battery systems for grid and modular sites. Long-duration, short-duration, hybrid. Storage is the conductor — we structure to its tempo.
SIZE5MWh — 500MWh+
MARKETSGlobal
FORMATGrid · Hybrid
V/05 · DATA CENTERS
PUE 1.10—1.25 · 5MW — 1GW+
Data centers.
Modular builds, power-first. Where compute follows electrons, we site the electrons first and the racks second.
FORMATModular
MARKETSGlobal
POWER5MW — 1GW+
V/06 · LNG
CH₄ · −162°C · 600× compression
LNG.
Bridge fuel for off-grid compute. Where the renewable build is still years out, LNG runs the racks until the grid catches up.
FORMATCryogenic
MARKETSGlobal
USEOff-grid compute
LATERAL ·
00 / 06
06/ 09Geography
Where we work.
WGS84 · NODES = ACTIVE PROJECTS8 NODES
→ CLICK + DRAG TO ROTATE
07/ 09How we work
Three moves. Every deal.
01
Map the gap.
We find the missing piece — capital, offtake, permits, equipment, structure.
02
Assemble the deal.
We bring the counterparties together and structure the agreement.
03
Close.
We sign, fund, and execute — then stay on through build, commissioning, and operation.
08/ 09Team
Operators. Allocators. Builders.
PORTRAIT01·AR
Adrian Rivodeaux.
CEO
PORTRAIT02·CD
Chris Dawson.
CTO · Energy Lab Lead
PORTRAIT03·JA
Jorge Alzamora.
COO
PORTRAIT04·FS
Francisco Silva.
Head of Business Development
PORTRAIT05·AV
Anastasia Vitruk.
Venture Partner
PORTRAIT06·BA
Brian Arbuckle.
Strategic Partner · ABC Solar
PORTRAIT07·MU
Max Undurraga.
Strategic Partner · MUB Group
Talk to us.
END OF TRANSMISSION · v 2.0
© 2026 Luz LATAM
Made for the last mile
Bogotá / Santiago / Mexico City